Kids Bath In Weston

Complete plumbing and electrical rough-in and fixture installation were completed for a two-story luxury home with smart bathroom features.

ClientJill RobertosScopeResidential plumbingAreaWeston, FLInstagramPostShare

The story

The project required careful coordination because the shower valve had to be relocated to the opposite wall while working around custom furniture, expensive finishes, electrical toilets, and detailed tile work. The rough-in and finish work were completed.

The home had a sophisticated bathroom layout with custom glass doors, high-end fixtures, smart toilet features, and a sharp modern finish. Plumbing and electrical work had to be planned around the final layout, furniture placement, tile elevations, and fixture locations. The shower valve relocation added extra coordination because the new wall location had to match the finished design and still allow proper access, alignment, and function.

Work completed

Completed plumbing rough-in, electrical rough-in, shower valve relocation, fixture connections, electrical toilet setup, bathroom finish installation, and final coordination around custom furniture, glass doors, tile work, and the finished layout of the two-story home.

Final result

The bathroom systems were roughed in and finished according to the updated layout. The shower valve was relocated, fixtures were installed, electrical toilet features were connected, and the finished space matched the custom design and modern appearance.